Showing posts with label Vanity. Show all posts
Showing posts with label Vanity. Show all posts

Wednesday, April 6, 2011

Progress.

April is here. The winter has flown by. We continue to plod on with the remodel, and we can almost see light at the end of the long, expensive, stressful tunnel. This is what's been happening in the past few months in Minturn.

  • Url and the dog down the road have a regular stand off. 
  • We have heat and water!!
Baseboard heaters

  •  I re-finished an old dining room table - I think its awesome - Chris is not so sure!!

Legs.

My lovely purple table
  •  The engineered hard wood floor arrived - we hope to install it this weekend!! Its acclimatising rght now!
Maple Nougat Hardwood Flooring - from SimpleFloors.com
  •  The bathroom vanity is finished
  • The shower is a work in progress - the tiling has been started, but is a job I keep avoiding. The plastic works well enough - so at least we can shower!! 


Plastic covered shower
  • The washing machine works, as does the dishwasher - which is a complete luxury. We need to vent the gas range and also the dryer before we can use those though!
  • Warrick the fish has been reunited with the family, after an extended stay in East Vail!
  • The fire-door in the garage has been installed. As has one of the bathroom doors. We are waiting for the clawfoot tub to arrive before the main door is installed. Hopefully next week!!!!!!! I can't wait to have a bath!!!!
Chris installing the door from the bathroom to the master bed!

Vanity

I really wanted a chunky, modern, double vanity in the bathroom - to match the double shower. After looking online we weren't prepared to pay the 1000 dollars plus to make it happen. Chris decided he could make the base and I could tile the top. Five months later - the double vanity is finished and looking awesome in our bathroom. I love it.

Url not so keen to be in the photo. Vanity base

I ordered the vessel sinks and facuets from Overstock.com - they were a bargain.


Back in November when the house was a full on construction site!

Darkest stain we could find.

Cement board down, then mortar and tiles. One mini tile at a time! It took a while.


Tiles finished


Starting to come together

A few coats of sealant before the grout.

Grout completed



Sinks and faucets installed. Trim finished.

Vanity completed. The mirror is temporary - watch this space for the final mirrors!!