Monday, April 11, 2011

Flooring

Our engineered hardwood flooring had acclimated for a week - so this weekend we had no excuses - we were going to lay the flooring in the kitchen, living room and hallway. There would be no fishing, snowboarding or relaxing until it was done. As it turned out our weekend was extremely dull. There were none of the above activities - we laid the last piece at about 5 pm Sunday. Thank goodness for the Masters. It was on all weekend and provided a slight distraction from all the bending, kneeling, glueing, sawing and splinters. The house now looks like a house, and not a construction site. Its awesome!


We started at the end of the hallway  - it ended up being the hardest area as there were a lot of cuts needed.

We lay the underlay first.

It took all day to lay this much. We ended friday somewhat deflated by how time consuming it was, but we were happy with how it was starting to look!

Day 2 - the kitchen and entrance way.

Once we didn't have to make many cuts, and we could just glue and click - progress was quicker


Url was exhausted

and then had a second wind, and wanted to help!!

The workshop in the basement

Almost finished with the kitchen

The KITCHEN!!

Hallway

We started the living room on Sunday




Only a few pieces left to lay

Happy to be almost finished!


Living room

KITCHEN

LIVING ROOM

Wednesday, April 6, 2011

Progress.

April is here. The winter has flown by. We continue to plod on with the remodel, and we can almost see light at the end of the long, expensive, stressful tunnel. This is what's been happening in the past few months in Minturn.

  • Url and the dog down the road have a regular stand off. 
  • We have heat and water!!
Baseboard heaters

  •  I re-finished an old dining room table - I think its awesome - Chris is not so sure!!

Legs.

My lovely purple table
  •  The engineered hard wood floor arrived - we hope to install it this weekend!! Its acclimatising rght now!
Maple Nougat Hardwood Flooring - from SimpleFloors.com
  •  The bathroom vanity is finished
  • The shower is a work in progress - the tiling has been started, but is a job I keep avoiding. The plastic works well enough - so at least we can shower!! 


Plastic covered shower
  • The washing machine works, as does the dishwasher - which is a complete luxury. We need to vent the gas range and also the dryer before we can use those though!
  • Warrick the fish has been reunited with the family, after an extended stay in East Vail!
  • The fire-door in the garage has been installed. As has one of the bathroom doors. We are waiting for the clawfoot tub to arrive before the main door is installed. Hopefully next week!!!!!!! I can't wait to have a bath!!!!
Chris installing the door from the bathroom to the master bed!

Vanity

I really wanted a chunky, modern, double vanity in the bathroom - to match the double shower. After looking online we weren't prepared to pay the 1000 dollars plus to make it happen. Chris decided he could make the base and I could tile the top. Five months later - the double vanity is finished and looking awesome in our bathroom. I love it.

Url not so keen to be in the photo. Vanity base

I ordered the vessel sinks and facuets from Overstock.com - they were a bargain.


Back in November when the house was a full on construction site!

Darkest stain we could find.

Cement board down, then mortar and tiles. One mini tile at a time! It took a while.


Tiles finished


Starting to come together

A few coats of sealant before the grout.

Grout completed



Sinks and faucets installed. Trim finished.

Vanity completed. The mirror is temporary - watch this space for the final mirrors!!

Sunday, March 13, 2011

Tiling

Having water in the house meant we were able to use the new tile cutter, to finish tiling the bathroom floor. Exciting times. Once the tiles were set, I used a tile enhancer and sealer. Tomorrow I grout, and Tuesday Chris installs the toilet !!!!!!!!!! That will be a great day!

Cutting tiles.

Concentrating.

Tiling finished, so I'm painting on the tile enhance/sealer (left side done)

Lovely tiles.

Tiles sealed, baseboard installed, and Chris put the door in last week. Just need to finish the steps!

We have water!

The heating guy worked all week to get the baseboards in place, and finish off a few last minute heating things. By friday we were ready for the Town of Minturn to come and turn on the water. It was a very exciting day. But as with everything related to the Minturn project, things didn't quite go to plan.

I think all the town workers turned up at the house to help (there were three of them), and they got to work thawing the ground to access the curbside water valves. The first valve they found turned off one of our neighbours water. The second was our other neighbours, eventually they found the correct valve. We eagerly waited for the water to enter the house, but after a few minutes 'sans water' we realised something wasn't quite right. Our excited bubble was burst. Did the orginial plumbers (who we eventually fired because they were so bad) make a mistake with the plumbing? Was there a leak? Were the pipes frozen?

Heating the ground

Turning the water on. Unfortunately no water came into the house. Boo.

We called the local pipe thawers - who quoted $200/hr to come over and thaw the pipes. We hoped it wouldn't take too long, if in fact the pipes were frozen. The alternative scenarios were not ones we wanted to think about. Digging in frozen ground to reach water pipes would have been a fair amount more expensive than thawing pipes, and calling the fired plumbers to find out if they messed up would have been an awkward conversation !! Thankfully within 10 minutes of heating the pipes, we had water pouring out of the taps!!!!!!! Thank goodness. The heating guy had left by the time we got water, so we haven't had any hot water or gas heating over the weekend. That should all happen on Monday. What a luxury!!


WATER

Thursday, March 10, 2011

Friendly visitors

These little guys came by the other night. I opened the back door and their eyes were on me. They were pretty tame, and wanted to come in. I declined, but they sat outside our window for several hours. Url was an awful guard dog - all he could muster was a little whine, no big protective woof. So disappointing.

Happy hanging out in the snow.

View from our bedroom window!

Basil and Fred (apologise for poor quality)