Wednesday, December 22, 2010

Drywall

Once the blown insulation was completed by the pro's - Chris and I got to the interior walls with some fiberglass. At the same time the guys got to work with the drywall. By the end of the weekend - good progress had been made. Hopefully by Christmas the whole upstairs will be drywalled, and ready for primer and paint !!!! Thats going to be an exciting day!

Rather them than me. So thankful for these talented guys!

Screwing the drywall in place

Chris and Url watching!!

The last of the free windows - perfect size and shape for the master bedroom - and lovely view of the back garden.

At the front of the house - wheres url ???
Impossible to hide with those ears!

A fiberglass frock. Itchy!
Cutting and stapling the interior insulation!

Drywall in the corridor

Kichen starting to get covered!

Spare bedroom

Bathroom ceiling going up

Corridor ceiling in!

Lots of snow outside the back door!!

2 comments:

  1. Looking realy good!!! can't wait to come and visit :)

    ReplyDelete
  2. Can't wait for you to come visit BOB!! You can stay in Chris' man cave! And ski the Minturn Mile home! xx

    ReplyDelete