Tuesday, February 22, 2011

A much needed break....

After several months of house related stress, hard decisions and some cold, uncomfortable nights at the house - Chris' wonderful mum organised a family holiday to St. John - in the US Virgin Islands, for Hans 60th birthday. It was exactly what Chris and I needed and a fantastic escape from the cold, snowy mountains.  We didn't think about the house in 6 days - and it was great. Not to make you too jealous, but here are a few piccies of our trip. 


Sunset at Ramshead 

View from our villa


Family shot - Steph, Sue, Hans, Hels and Chris

Stunning sunset

Last day on the beach - all smiles

Saturday, February 5, 2011

Progress.

February 5th - this is how the house is coming along thus far.

  • The whole of the upstairs has been drywall, primed and painted. There are a few touch ups we need to do in the kitchen but yesterday we finished the living area and corridor - colour True North - another off white!!
  • The kitchen is here - most of the cabinets installed correctly (we need to move two cabinets down an inch - doesn't sound much but its a process!). All the appliances are here and in place - but not installed. 
  • The template for the granite counter-top has been taken and is in production! 
  • Washer and dryer here - again, in place - but not installed. 
  • The lack of installation is due to the lack of gas and water. All pipes are in and heating system/hot water tank are in, but gas and water meters are not - therefore we continue to wait! 
  • Carpets are installed in both bedrooms. 
  • Home-made bathroom vanity is almost finished - just a little tiling left to do and the trim!
  • Garage has been drywalled. Just need the fire door - and then its all enclosed!
  • Banister around stairs is in. Whether it would withstand 200lb of force - as the 'code' requires, is another question!! Handrails cut to length -just need to screw in place!

The wonderful apron sink caused a few problems during installation into the sink base cabinet - but after a little stress and some resourceful DIY skills from Chris - we saved the sink base - and also got the sink level, sturdy and in place!!

Kohler sink - a wonderful retrieveful of Christian from a posh house in Vail!!

Banisters and guard rail up- the gaps have now been filled and it looks great.

The stairs were enclosed with dry wall

Mechanical room to the right - everywhere else storage right now!

Home-made vanity getting closer to being finished  - I glued all the small tiles to tile sheets - it only took about 15 hours!

Painting the corridor

Corridor painted

Living room painted - the blue tape is now off the window frames!!
 
The biggest thing that is holding us back is the gas meter - after three weeks of waiting - a lady from Excel came to the house yesterday. Apparently the meter is in an unsafe place -snow could fall off the roof and injure the gas-man who reads the meter - or ice could build up around the meter and cause a gas blockage - therefore even though for 40 plus years this wasn't a problem - we can't put the meter back. Our options were to build a 5ft by 3 ft roof over the meter - or remove all the snow that has built up against the house (probably 5 ft high and 3 ft wide) from the meter to the back of the house (approx. 30 ft). Then pay the gas company to dig a trench (into frozen ground, which would therefore need to be heated); and extend the gas pipes to the back of the house. We would also need to then pipe the pipes inside the house which are currently to the original meter, to the back of the house - an estimated cost of $4,000!!!!!! Therefore my wonderful husband busily got to work building an ovesized birdhouse roof to cover said meter!! With over 8 inches of snow last night, and its still coming down - erection of the roof is on hold. Hoping it will be completed by the end of the weekend - and we can then get the gas-man to come out and install the meter - without risk of getting hit in the head with a slab of icy snow off the roof!!

Once we get gas - we get water and heat!!!!!  That day cannot get here quick enough.

Sunday, January 16, 2011

Kitchen

With the cabinets due to arrive any day - we needed to get the kitchen primed and painted. We managed just in time as they arrived on Wednesday (Jan 12th). Our wonderful friends Walt and Christian came and helped install them. With just a few challenges left to negotiate (namely the sink base, appliance installation and some alterations to the electrical work- oh and water) the kitchen is almost finished (also need flooring - but the plywood might have to do the job for a little while longer as wood floors are not in the budget right now!!), (also need the counter-top, which is being measured for on Tuesday)!!!

Mardy about having to mud the drywall again!

Priming the kitchen

Speedy hands

Priming finished!

Painting finished!

Cabinets arrived!!!!!

Kitchen prepped and ready for the cabinets!

Chris and Christian starting to hang the cabinets

Impressed with the slow closing hinges (prevents the draws from banging shut!!!)

Walt and Christian making sure everything is level!

Almost finished.

Bathroom

We are still waiting for water. The hold up is the gas meter. Until we have the gas meter we can't have gas. We need gas for the heating, and until we have heating in the basement, we can't have water, because the pipes will freeze! Pretty long winded, but hopeful we will have water by the end of the week.

While we wait for water, we have been working on the bathroom. Drywall, mudding, priming, painting, red guarding the shower, laying the hardi-backer, and starting the tiling. We came to a stand still with the tiling because when we went to use the tile cutter - we realised we needed a water supply - not just plastic bottles of water (which we used for the mortar). So we wait.

Chris sanding the drywall in the bathroom- nasty job


Starting to prime the walls - the red on the right is the red guard in the shower (waterproofs the cement board)

More priming


Starting to paint - colour - silver tradition.

Two coats of paint later and ready to mortar - and lay the hardi-backer

Hardi-backer down

Starting to lay the lovely limstone tiles!

Pleased with the outcome thus far.

Thursday, December 30, 2010

Christmas

Don't have to much to write - so here are some pictures of how the house looked on Christmas. Not liveable. Not Christmasy. Not what we had hoped it would look like - but on a positive note, progress continues to be made!!

View of the Kitchen. Drywall has has been taped and mudded. Corner beads in place.

Living area and stairway to basement

Bathroom - shower has been cement boarded and drywall completed. Need to tile the floor and shower.

Corridor towards living area. Firewall on left needs one more layer of drywall!

Chris made a garage door - so the house is now completely enclosed. Url's butt in view!

Wednesday, December 22, 2010

Drywall

Once the blown insulation was completed by the pro's - Chris and I got to the interior walls with some fiberglass. At the same time the guys got to work with the drywall. By the end of the weekend - good progress had been made. Hopefully by Christmas the whole upstairs will be drywalled, and ready for primer and paint !!!! Thats going to be an exciting day!

Rather them than me. So thankful for these talented guys!

Screwing the drywall in place

Chris and Url watching!!

The last of the free windows - perfect size and shape for the master bedroom - and lovely view of the back garden.

At the front of the house - wheres url ???
Impossible to hide with those ears!

A fiberglass frock. Itchy!
Cutting and stapling the interior insulation!

Drywall in the corridor

Kichen starting to get covered!

Spare bedroom

Bathroom ceiling going up

Corridor ceiling in!

Lots of snow outside the back door!!