- All the cement for walls and footers have been poured. Only slab (floor) left to pour.
- All walls in the house have been framed, including closets in both bedrooms.
- Every wall in the house has had drywall and old insulation removed.
- Fire wall framed, outside wall finished. Awaiting insulation and drywall inside.
- New floors laid throughout except for small section at the front door.
- Staircase to basement underway.
- Plumbing - 'rough in' underway.
- Ceilings dropped, leveled and framed thoughout (thanks to Walt, Christian and Chris today)
- Electrician starting this week (we hope)
- Kitchen cabinets, appliances and granite counter-tops ordered.
- Tiles for the bathroom bought - a super nice, grey limestone.
- One of eight windows replaced.
Lovely blue front door and new window in place. The door is a slightly odd shape and therefore does not fit the door frame well - so unfortunately we will probably have to get a different one. |
Staircase into basement being built |
View from basement |
The very back wall of the new basement finished. |
The lowest framing seen is the new level ceiling. |
New double shower tray bought and in place! We will tile the walls |
Fire wall from outside finished. Just needs the stucco now! |
Walt helping with the ceiling today - couldn't have finished it so quickly without him - thanks!! |
Walt and Christian measuring. |
They were there till dark - but got the whole ceiling framed in a day!! |