Thursday, July 24, 2014

Cement Staining

With time ticking along, and bebe's due date fast approaching - we needed to get going with the flooring. The guest room was finished, the bathroom tiles were ordered so that just left the man cave and the mud room. Chris had free rein for the man cave so he decided to stain the cement rather than spend time and more money on installing/buying flooring. After quite a few hours trawling through you tube to find the best way to do it - he was ready to get started! It took him two weekends of hard graft, and a couple hundred dollars for materials but it turned out great! This was finished at the end of April!

The Man Cave before Chris started prepping. Covered in paint and dry wall plaster.
Chris spent many hours on his hands and knees scraping the paint and dry wall plaster off the cement!

Scrubbing the floor.
Ready for the stain.
My handy husband!

Beautiful, shiny stained cement floor  - finished!

Sunday, April 13, 2014

Plywood floor

Chris spent last month priming and painting all the basement rooms. The next phase of the remodel and out major goal before Baby arrives is to install flooring in every room down there, so we are not traipsing dirt and drywall dust into the main part of the house. Having researched a variety of options, most of them were not in our budget. So with a little inspiration from Pinterest I decided a 'plywood floor' in the guest bedroom would be a great solution. Chris had to be convinced as he was the one that would need to do most of the work, but he soon came around to his pregnant wife's grand idea. (He's a keeper for sure!!). He stipulated one condition though - I had to go to Home Depot and get the plywood.

So off I toddled to Home Depot, looking pregnant and trying my hardest to speak with my best English accent (its fading fast). Two very helpful guys helped my choose plywood for the subfloor (to go over the cement slab) and plywood to be cut into 8 inch planks, which would eventually become the new flooring.  They even used their industrial cutter to make those 8 inch planks for me. Once I had all my wood (3 hours later) I called Chris and Cody to come collect it all for me in Cody's truck (Thanks Cody!!).


10 pieces of 4'x8' ready to be sliced into 8 inch planks
                             
My two very helpful men, cutting the 10 sheets of plywood into 8" x 8' planks
Next job was to empty the guest room of clutter and prep for the sub floor. We needed to install a sub floor because it would have been impossible to nail or glue the plywood planks directly to the cement. Plus if we were to get any moisture down there, which is a possibility because it is below ground, then we needed to prevent water damage.


The guest room ready empty and ready for the sub floor
We laid 2 sheets of 6 mil plastic, just in case any water started to seep through the cement
Chris had to pre drill holes in the cement and then get the cement screws in place. Every screw was a battle and in total we went through about 15 drill bits because the cement was so dense. After a full day the 3/4 inch plywood sub floor was in place.

Meanwhile, I spent my time sanding all the plywood planks to get rid of any major splinters, smooth the coarse mill finish and remove any stamps or ink marks on the surface. It was a process. 

Eventually the planks were ready to be glued and nailed in place. We invested in a nail gun, which made the nailing go super quick. We used a random metal bracket as the spacer between the planks. We were going for the rustic, farmhouse cottage look, so some discrepancies in the spacing wasn't an issue for us. 
Installing the plywood planks took a day. 


We were pleased with the outcome, but needed to stain and polyurethane the wood in order for it to be a useable floor. The plywood is too soft to leave in 'au naturale'.
I decided to do a white wash stain over the plywood, so you could still see the grain, but without all the pink tinges of the plywood.  I mixed one part white primer with two parts water, and slopped it on using a paint roller. 

After 2 coats of stain, Chris covered the wood with 2 coats of polyurethane. We would have done another coat, just to further protect the wood, however the smell throughout the house was too much to deal with being pregnant, so we stopped at two.
I think it turned out pretty good. 

Semi-gloss finish




Nice wide planks, good spacing and the wood grain is still visible. 
Overall, we are super pleased with the outcome. Once the sub floor was in place, the planks went down really easily, especially once we figured out that the glue came out the gun with a lot less effort if it was warmed before hand. Cold glue is difficult to work with!! All up it probably came to around $3 a square foot. A little more expensive then we had anticipated, but the sub floor probably cost $2 a square foot to install. Considering the wide, planked flooring we had been looking at was over $10 a square foot, I think it was a great investment. Hopefully once we start using the room as a guest room, it holds up to the wear and tear. I'll keep you updated!

Saturday, March 30, 2013

The Basement

After a year long hiatus from anything involving a saw, nails or paint, it was time to get back on it and start the Basement Remodel!!!

We are pretty excited about this! Chris probably more so than me because his beloved Man Cave is becoming a reality not just a far fetched fantasy!! I'm happy because I get to declutter, sort and organise (throw out) a growing mountain of junk that is being stored in the basement! Plus I also get to design the second bathroom and guest bedroom!

Here's a preview of the before, very cluttered basement, and then some of the work in progress! First job is framing, then electric, insulation and drywall. Hopefully this will all be completed by late Spring!


BEFORE: Laundry Space
BEFORE: The man cave, with the ever increasing pile of junk!
BEFORE: The guest bathroom to the left and another pile of junk where the guest bedroom will eventually be!
AFTER: Framed Laundry Room
AFTER: Pile of junk and framed MAN CAVE
View from MAN CAVE of the eventual MUD ROOM, which will also be framed. Eduardo, the guy who basically built our house is back again helping out with the Basement remodel! He brought a couple of new guys to help with this project!
AFTER: Framed Bathroom. Low ceiling because of pipes above  - not ideal but will be 80 inches high which just passes code requirements!!
Framed partition/closet in the guest bedroom - looks a little weird but saw it on Pinterest and think it will look really cool when finished!! (Chris is not so sure - we will see!!)
View from the closet in the guest bedroom! To the left is the mechanical room. To the right is the doorway with the bathroom behind it.

Tuesday, December 14, 2010

Basement - DONE

Blankets and ground heater pipes - keeping the ground toasty in preparation for the cement.

Eduardo and Manuel finishing the slab after the cement was poured.

The back section was completed and left to dry while the front section was poured!


The basement finished - and already being used for storage.
Last week the basement was completed. The ground heaters did there work - the ground was ready for the cement. It was poured in two sections over two days. Back, then front. It looks awesome

Saturday, December 4, 2010

Ready for the slab

The unfinished basement is almost finished. Plumbing and drains are all in place. Gravel and wire is laid. All that is needed is the cement, which should be arriving on Monday!

As I write the ground heater and blankets are warming everything up, in preparation for pouring! Its looking great down there, and turned out to be a massive space!

Ready for the cement

View from driveway - there will be a one car garage, mud room, laundry room, mechanical room, man cave and storage!